Latest Projects
CAPE LAMBERT MESA A POWER POLES
CLIENT: Future Engineering
DURATION: February 2009 - September 2009
TONNAGE: 570 Tonnes
Power poles ranging in length from 16 to 21 metres were galvanized and despatched at our Naval Base factory.
CLIENT: Future Engineering
DURATION: February 2009 - September 2009
TONNAGE: 570 Tonnes
Power poles ranging in length from 16 to 21 metres were galvanized and despatched at our Naval Base factory.