ALLTYPE WORKSHOP

CLIENT: Alltype Engineering

DURATION: November 2010 - January 2011

TONNAGE: 250 Tonnes

All steelwork for their new workshop in Naval Base was hot dip galvanized for maximum protection due to its close proximity to the ocean.